•Application:
After Jackup Rig finishes well drilling, pile shoes shall be pulled out for moving the pile leg. Mud around pile shoe shall be flushed off by using high-pressure seawater, so as to facilitate pile pulling. Jetting hose is high-pressure flexible connection between main deck of platform and seawater pipe line among pile legs.
•Hose structure:
Inner Tube: Nitrile rubber based liner, oil resistant, seawater resistant, high temperature resistant and ageing resistant.
Reinforced Layer: High-intensity steel wire
Cover: Neoprene rubber based cover, anti-flaming, wear resistant, oil resistant, ozone & ageing resistant and UV resistant, applicable to marine environment.
•Temperature range: -30℃ to +100℃.